PROJECT RESOURCES

Useful information,
ready for review.

Build a review package around the drawings, schedules and decisions that carry through procurement, installation and turnover.

DOCUMENT CONTROLREVISIONA / PROJECT SETRoom scope → equipment → alarm → closeout

SUBMITTAL CHECKLIST

Keep the project record complete.

Use this checklist to structure a submittal or coordination package. Exact document requirements depend on the contract and project team.

01

Equipment schedule

Family, model, quantity, room served, panel identifier, nominal rating, mounting and approved options.

DOCUMENT SET
02

Electrical drawings

Current one-line diagram, isolated-system boundary, panel schedule, circuit names and source transfer concept.

DOCUMENT SET
03

Alarm schedule

Source device, alarm label, priority, local / remote destination, acknowledge behavior and reset owner.

DOCUMENT SET
04

Submittal review

Product dimensions, thermal and enclosure conditions, terminal information, communications and service clearances.

DOCUMENT SET
05

Closeout record

Test results, training record, final settings, as-built documents and facility maintenance responsibilities.

DOCUMENT SET

REGULATORY COORDINATION

Use the current project basis.

Electrical and healthcare requirements vary by jurisdiction, facility type, room classification and adopted code edition. Project teams coordinate these requirements with the applicable standards and authority having jurisdiction.

Review care environments →